August 14, 2006
Inspired by a Knitty Gritty episode, I have decided to fix some problem knits. The highest priority was the first cable sweater I ever did. I blindly followed the pattern and completed the entire sweater, only to find that the torso was about 5 inches too long for my liking. If it were the 80s, I could've thrown on a belt and made a mini-dress out of it. Sigh. I wore the sweater a couple of times out of obligation, but I never liked it.
So this past week I did the scariest knitting thing I've ever done: I cut the bottom off with scissors and knitted new ribbing on, eliminating several unwanted inches. Which meant picking up stitches out of cables. Yikes.
I don't know if you can really tell from this before and after photo how much length I lost, but it was quite a bit. I lost a little blood, sweat, and tears in the process too. But now I have a sweater that I will actually wear, instead of one that looks nice from a distance but never leaves the closet.
I told myself that I don't want to move on to new projects until I am happy with the ones I have. That means I've got about four or five sweaters to either rip out completely and salvage the yarn for something else, or to fix somehow. Probably rip out, in all honesty, for they're such a waste of yarn.
Off to tackle another monstrous garment...
Posted by: Sarah at
10:50 AM
| Comments (3)
| Add Comment
Post contains 306 words, total size 2 kb.
Posted by: zib at August 14, 2006 12:27 PM (bCSy9)
Posted by: Lou at August 14, 2006 03:29 PM (0+7qK)
Posted by: MaryIndiana at August 17, 2006 06:39 PM (paBpt)
49 queries taking 0.0729 seconds, 200 records returned.
Powered by Minx 1.1.6c-pink.